Double Girder Overhead Crane with hook is the most basic type of crane machine. It is widely used at machining workshop, storage, etc. The double girder overhead crane is composed of metallic structure, trolley, electrical and movement mechanism. Some special designed Double Girder Crane is used in specialized atmosphere, such as casting workshop, smelting shop, waste yard. There are special lifting tools or material for them.
The double girder overhead crane usually has two working duty: medium and heavy. If not special function and working condition, usually medium working duty is enough for ordinary work.
European style double girder overhead crane
1. When the double girder overhead crane is used at first time, it must be inspected after lifting 0.5m high, worker should check brake performance, make sure it is reliable, then start work regularly.
2. Alarm should be run with following condition:
3. During operation, all the instruction signal must be unified regulations.
4. If power is cut off suddenly during operation, all control buttons should be set back to Zero. Before re-start crane, inspect all parts in good condition.
5. If you want to change crane / trolley traveling direction when it is traveling well, you must set back to Zero first, then start another direction.
6.If one overhead crane has two hooks, when two hooks are replaced to use, or both lifting height is close, you should operate one hook to avoid two hooks collide.
7.If one crane has two hooks, we don’t allow two hooks to lift two objects at same time. When not work, adjust lifting brake.
8. Don’t allow to stop crane by limiter on limit position. When crane is loading, we can’t adjust lifting brake.
9.Don’t lift once following ten conditions:
10. During working, if any abnormal voice or movement, stop operation immediately, inspect crane.
After working:
Double girder overhead crane precautions to ensure your overhead crane operation safety and efficiency. Dongqi Double girder overhead crane lift you up!