A poured foundation can cost as much or more than the jib crane itself.
Quick and easy installation!
Poured foundations can take up to a week to cure before you can install the crane.
Now there’s no waiting to watch concrete dry with a foundation-less jib crane.
Flexible for easy relocation!
It’s easy to relocate freestanding foundationless jib cranes when there is no poured foundation.
That means more flexibility in choosing initial location. You can place it closer to machines or other obstructions because there is no need for several square footage of area for a concrete pour.
Ease of movement!
The high strength enclosed track design keeps rolling surfaces clean. This contributes to easier movement and longer life.
Ease of rotation!
The steel enclosed track weighs less and therefore rotates easier.
Precise load positioning!
A hoist trolley with low rolling resistance and lubricated-for-life sealed bearings combined with the easy rotation of the boom makes for efficient load positioning and spotting.